Building Permits & Inspections

building developmentThe Building Permit Department is located in Wolfforth City Hall at 302 Main Street.  For any questions, please call (806)855-4134 or email plans1@wolfforthtx.us

IMPORTANT INFORMATION REGARDING BUILDING PERMITS & INSPECTIONS:

  • The City of Wolfforth is currently only accepting permit applications online. Apply for building permits, submit plans and make payments online in our Public Portal
  • Building Inspections must be scheduled on the online portal. Inspections received by 5pm will be scheduled for the next business day. Emergency inspections for occupied property only must be called in by 3pm to schedule a same-day inspection. Please leave the following information to request your inspection:
  1. Contractors Name
  2. Name of Calling Party
  3. Type of Inspection Requested
  4. Correct Inspection Address
  5. Permit Number (if available)
  6. Return Phone Number
  • If anyone on your job site has reported or displayed any flu, cold or virus symptoms, do not call in an inspection. The City of Wolfforth is following SafeBuilt’s safety protocol and, if the Building Inspector is on site and any personnel appear to be symptomatic of flu, cold or virus, he has been instructed to leave the job site without completing the inspection.  This may result in the issuance of a RED TAG until he can go back out and safely perform the inspections. 
  • RED TAG fee is $70.00 and must be paid before another inspection will be scheduled.
BUILDING CODES – EFFECTIVE 4/1/2019Effective 4/1/2019, construction in the City of Wolfforth will be regulated by the following as amended by Ordinance No. 523:

Construction Permits
The City requires construction permits on new construction and on additions or remodels and follows the 2012 International Building Code. Builders are responsible for permits, and building plans must be submitted and reviewed before any permit will be issued. Submittals for both commercial and residential new construction require one set of construction plans to be uploaded to the customer portal. In addition, a Res-check, and stormwater management plan applications. Incomplete applications will not be processed. For complete applications, please allow 5 business days for processing.

Permits are issued for 180 days. Although all work does not have to be completed, the project must show progress.  Failure to begin construction within 180 days will cancel the permit.

Please be aware that some neighborhoods require proof of architectural review approval before a construction permit may be issued. Check with the developer or contact 806-855-4134 for the list of neighborhoods.

Inspections are performed Monday-Friday, and will be completed the next business day after the inspection is called in. We do not offer same-day inspections. The Building Inspector is not available on weekends. Inspection requirements and information may be obtained at City Hall or from the Building Inspectors. Call 806-855-4134 for information.

For all permits fees, please see the City of Wolfforth Master Fee Schedule below 

Order of Required Inspections

Order of Required Inspections
1. Footing
2. Plumbing rough
3. Sewer and service lines (water and gas)

Numbers 1-3 must be complete before slab inspection.
4. Slab
5. SWPPP Inspection
6. Plumbing top out
7. Gas (Partial)
8. Mechanical Rough (Heating and air ducts, mechanical vent ducts) *During the months of October to April (dates vary) a temp heat is required. 
9. Electrical rough
Numbers 4-9 must be complete before framing inspection.
10. Framing
11. Electrical Meter Release (Must be done before electrical final)
12. Electrical underground service (if applicable)
13. Electrical final (ELECTRICAL SUBCONTRACTOR should request electrical inspections.)
14. Plumbing final and Gas final (PLUMBING SUBCONTRACTOR should request plumbing inspections.)
15. Heating and air conditioning final (MECHANICAL SUBCONTRACTOR should request mechanical inspections.)
Numbers 10-15 must be complete before final building inspection.
16. Final building inspection (before building is occupied) – Insulation scuttle hole card should be in place.

GENERAL CONTRACTOR should request structural inspections.
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

CLICK HERE FOR PERMIT FORMS DOCUMENTS5 documents

  • Backflow Report
    document seq 0.00
  • Builder Utility Account Application
    document seq 0.00
  • Stormwater Management Application
    document seq 0.00
  • Stormwater Management Amendment
    document seq 0.00
  • Commercial Building Application and Checklist.pdf
    document seq 0.00